The M House townhouse project is in its final stages of completion, with construction progress reaching 85%. The 3A Design team is working diligently to complete the interior with meticulous attention to detail, and is providing ongoing updates on the townhouse project’s progress.
From design concept and material selection to construction, 3A Design always puts dedication and meticulousness into every step to deliver a modern and functional home for the homeowner.
Join 3A Design in anticipating the 100% completion of M House!











Learn more: M-House Modern Townhouse Design
Project Information
| Location | Scale | Land Area | Total Construction Area |
| Long Thanh, Dong Nai | 1 ground floor, 2 upper floors | 153m2 | 102m2 |
Functional Layout
- Ground floor (Floor 1): Nail spa business, living room, bedroom, kitchen.
- Floor 1 (Floor 2): Master bedroom + WC, daughter’s bedroom + WC.
- Floor 2 (Floor 3): Guest bedroom + WC, game room, BBQ area, rooftop terrace.

Tiếng Việt