During the meeting, the 3A Design team of architects and engineers presented a detailed cost estimate for the structural work of the project. This estimate included key costs such as infrastructure, building materials, labor, etc. These costs were analyzed in detail to ensure accuracy and transparency.

A detailed cost estimate not only provides clients with a comprehensive and clear overview of the total project cost, but also helps them better understand all items in the estimate, thereby enabling them to manage their budget effectively.

Project Information

LocationScaleLand AreaTotal Construction Area
Vung Tau1 ground floor, 3 upper floors115m285m2

Functional Layout

  • Ground floor (Floor 1): Living room, kitchen, dining room
  • Floor 1 (Floor 2): Master bedroom, master bathroom
  • Floor 2 (Floor 3): Son’s bedroom + WC, Daughter’s bedroom + WC, library
  • Floor 3 (Floor 4): Study room, prayer room, gym, WC, swimming pool